Gazprom Export – Headquarter building reconstruction, St. Peterburg, Russia
- Building function replacement from hotel to office building
- Existing facade retention and protection during reconstruction
- Existing structures capacity check
- Structure system transformation – Demolition of upper walls supported slabs and replacement by columns supported slabs
- Reinforcement of lower floor levels slabs
- Existing reinforced column strengthening
- Demolition of central ground floor column and load transfer to surrounding structures
- Design of the atriun with new stairs
- Client: Arup/Montinvest Ltd
[Not a valid template]